How to Fill Out the Watering Schedule Form
Be sure to use a pencil when filling out this form. By using the included example and the information below, you should have all the information you need to construct your personal water schedule.
Station Number and Location Identify the station number, location and the type of plant that is being watered.
Watering Day Identify whether you want to use a calendar day or an interval day schedule. For a calendar day schedule circle the day of the week in which watering is desired. For an interval day schedule, simply set the corresponding number of days.
Program Start Times Indicate the time of day that the program will begin. Each program can have 1 to 4 start times. However, one start time can run an entire program.
Station Run Time Indicate the run time (1 minute to 4 hours) for each station. Write OFF for any station that you do not want to operate in the program.
Keep this schedule in a safe place for quick reference later, rather than scrolling through program information on the controller.
|